Rejoignez notre communauté
Nous contacter :
(437)-475-2066
support@canadasnowguards.com
A free snow guard calculator for Canadian metal roofs. Pick your snow guard, choose how it attaches, enter your roof measurements, and get the rows, guard count, layout and price in Canadian dollars.
Need a continuous snow rail instead? Use the snow rail calculator.
Row spacing tightens as the roof gets steeper. These are the maximum distances between staggered rows, in feet, for ground snow loads up to 45 PSF (2.15 kPa).
Individual pad-style snow guards are rated for ground snow loads up to 45 PSF, which is 2.15 kPa. Above that, a continuous rail system such as SnoBar or ColorBar is the right fit. Call 437-475-2066 or visit canadasnowguards.com for a rail layout, or size a rail system with the snow rail calculator.
Four numbers drive the whole layout. Take them once and the calculator does the rest.
The length of the roof edge the snow slides toward, in feet. This sets how many guards go in each row.
Measure up the slope along the panel, from the eave to the ridge. Do not use the floor plan dimension. Longer runs need more rows.
The rise in inches over 12 inches of run. A 6/12 roof sheds snow harder than a 3/12 roof, so its rows sit closer together.
The flat between two ribs or seams. Flats up to 16 inches take one guard. Flats 17 to 24 inches take two.
Your panel type decides it. Standing seam panels float as they expand and contract, so they should never be screwed through. Exposed-fastener panels such as PBR, R-panel and ag panel can take either method.
It depends on roof pitch, the run from ridge to eave, and panel width. Divide the run by the row spacing for your pitch and round up to get the rows, then allow one guard per panel flat in each row, or two on flats 17 to 24 inches wide. A 40 ft eave with a 20 ft run at 4/12 pitch on 16 inch panels works out to 60 glue-down guards in 2 staggered rows.
Yes, but never with screws. Standing seam panels float as they heat and cool, so use glue-down guards on the panel flat or a SnoCleat RC that clamps to the seam.
Surebond SB-190 needs about 28 days at 10°C (50°F) for a full cure. Colder spells pause the cure and stretch that time, so plan glue-down installs for the warm months.
One tube attaches roughly 20 to 25 of the smaller polycarbonate guards, or about 10 of the larger ones. Coverage varies with how the adhesive is applied.
Rarely. One row carries the whole snowpack by itself. Staggered rows repeated up the roof share the weight, which is why the calculator adds rows as the run gets longer or the pitch gets steeper.
In conditions beyond the designed layout, a glued guard will usually release from the panel instead of damaging it or causing a leak, and it can be glued back in the same spot.
Yes. Enter the first roof area, press Add another roof area and enter the next one. The calculator adds every area into one estimate and one cart.